THE GAMBIA PETROLEUM COMMISSION

Data Management

Exploration in the Gambia’s Petroleum sector included surveys principally comprising of geophysical and geological investigations. These investigations have been going on since the fifties and have led to the generation of huge volumes of valuable data that represent asset. These data and information assets need to be managed as envisaged by Section 5 (k) of the Petroleum Commissions Act, 2021 which mandated the commission to amongst others manage the national petroleum repository.

All Geophysical data acquired in the Gambian jurisdiction by Government, its partners are properties of the Government regarded as valuable national resource and asset. Such value can be significantly increased through a proper data management system.

The data management system currently being developed provides a framework for the collection, standardization, storage, security, maintenance, and dissemination of geophysical and geological data. The details on how this will be attained will be elaborated in a stand-alone data management policy.

Objective

To establish a comprehensive data management system and solution, that integrates the physical, digital data and information into a one stop shop, making it easily accessible to enhance exploration in the Gambia.

Data Types

These data exist in various formats, including paper copies, digital, cartridges and hard drives, covering best part of Gambian jurisdiction. 

The specific objective of the Commission’s data management program is to create a comprehensive catalogue of all these geophysical and geological data, maintain a digital library that is accessible globally, and establish a physical data center that is accessible within country.

Coverage:

3D Volumes: There are number of volumes of 3D seismic data and reprocessed versions of these data covering, A0, A0DW, A1, A2, A4 and A5. Details on each of these surveys are as provided below:

Project Name

Version

Location (Offshore)

Size (Sq km)

Vintage

Gambia 3D A1/A4
PSDM & merge

3D Seismic

Licence Areas A1
and A4

2,566

2011

 

3D Seismic

Licence Areas A2
and A5

1,504

2015

 

3D Seismic

Licence Area A1

500

2003

JAAN

Merge Data
Volume into a Regional Exploration Tool

Licence Areas, A1,
A4, A2 & A5

2,566

2018

FAR/PETRONAS

3D Seismic

Offshore Licence
Area A5

658

2020

Gambito

3D Seismic

A0 & A0DW

3,195

2020

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2D Coverage: The Gambia’s prospective areas are extensively covered with 2D seismic data and a number of reprocessed versions of these data covering, A1,A2, A3, A4, A5, A6 and onshore. Details on each of these surveys are as provided below:

Project Name

Version

Location (Offshore)

Size (Km)

Vintage

NWAAM 2012

2D Seismic

Licence Areas
from A0 – A6

2000

2012

NWAAM 2017

2D Seismic

Licence Areas
from A0 – A6

1513

2017

 FG99

2D Seismic

Licence Areas
from A1, A2, A4 & A5

1009.83

1999

 V01FG

2D Seismic

Licence Areas
from A1

720.08

2001

 VF99 (Pilot)

2D Seismic

Licence Areas
from A4 & A5

101.49

1999

 VER01 MWT

2D Seismic

Licence Areas
from A1, A2 & A3

335

2001

Others: Bathymetric, gravity, and magnetic data are essential tools for exploring and understanding the geology and seafloor topography. The Gambia’s prospective areas A1, A2, A3, A4, A5, and A6 are extensively covered with gravity and magnetic data, with bathymetric data only available for A0, A1, A2, A4 and A5. Details on each of these surveys are provided below:

Project Name

Version

Location (Offshore)

Size

Vintage

MSGBC_MB&SS 2018

 Multi-beam

Licence Areas from A0, A1, A2, A4 and A5

6,300 sq km

2018

Sea-bed core

Licence Areas from A0, A1, A2, A4 and A5

25 cores

2018

NWAAM 2012

Gravity and Magnetic

Licence Areas from A1 – A6

2,000 km

2012

There have been five wells (Brikama, Sarakunda, Jammah-1, Samo-1 and Bambo-1) drilled over the Gambia’s jurisdiction, resulting in extensive volume of cuttings, logs and a number of cores.